Case Studies

Capenhurst 100 MW Battery: A World First

Zenobe is building the first battery to absorb reactive power direct from a transmission network in the world. It will also be the largest transmission connected battery in Europe.

Claredown Fast Reserve Power

Zenobe's 20MW site at Claredown is part of the portfolio providing Fast Reserve to National Grid.

Battery for United Utilities

Zenobe installed and operates a behind-the-meter battery at United Utilities’ Preston wastewater treatment plant to lower costs and reduce emissions.

Second Life Battery for National Express in Coventry

Zenobe provided an end-to-end, fully funded solution for bus operator National Express that seamlessly utilises recycled ‘bus battery cells in an onsite battery energy storage system.

Abellio London Bus Depot

Zenobe provided financing and is operating a range of cost reducing and environmentally friendly solutions for bus operator Abellio in London.

Stagecoach Park and Ride

Zenobe provided the battery charging infrastructure for nine electric buses for bus operator Stagecoach in Guildford, UK.