Claredown Fast Reserve Power

Zenobē Claredown

Zenobē’s 20MW site at Claredown was part of the portfolio providing Fast Reserve to National Grid.

01.

The Challenge

National Grid, Great Britain’s Electricity System Operator (ESO), needed rapid and reliable delivery of reserve power to manage frequency. One way in which this was achieved was through large power generators in the Fast Reserve market who needed to deliver at least 50MW of active power in under two minutes.

02.

The Solution

Zenobē’s team of data scientists and software developers created software and hardware capabilities to connect our portfolio of batteries to the ESO. This means that the System Operator could deploy at least 50MW from our portfolio of storage assets onto the electricity network whenever there was a sudden drop in frequency, with each event lasting from a few seconds to several minutes.

While most providers of this service took nearly two minutes to respond, we delivered over 50MW in under 10 seconds.

This leap in performance stabilised the network much faster, enhancing system security and saving money. We are the only storage owner and operator capable of providing this service today.

In numbers

72994
c.2,463

tonnes of CO2 saved from entering the atmosphere each year

03.

Key Results

  • Industry-leading speed
  • Lower costs
  • Reduced emissions

Want to learn more? Contact us

Sign up

Get the latest insights on how energy and transport sectors are moving to net zero.

Peter Smith

Head of Product

Pete leads Zenobē’s growing team of Product specialists across all areas of the business. His team oversee our R&D as well as product development in both hardware and software.

 

He has been working in the European E-Mobility sector from over ten years, specialising in the design, build and delivery of software systems for EV Charging.