Zenobē’s 20MW site at Claredown was part of the portfolio providing Fast Reserve to National Grid.
National Grid, Great Britain’s Electricity System Operator (ESO), needed rapid and reliable delivery of reserve power to manage frequency. One way in which this was achieved was through large power generators in the Fast Reserve market who needed to deliver at least 50MW of active power in under two minutes.