
Kilmarnock South: Delivering Grid Stability with 300MW of Battery Storage
Kilmarnock South’s 300MW battery energy storage system delivers grid stability, and cuts curtailment, emissions and fossil fuel reliance in the UK.
National Grid, Great Britain’s Electricity System Operator (ESO), needed rapid and reliable delivery of reserve power to manage frequency. One way in which this was achieved was through large power generators in the Fast Reserve market who needed to deliver at least 50MW of active power in under two minutes.
tonnes of CO2 saved from entering the atmosphere each year*

Kilmarnock South’s 300MW battery energy storage system delivers grid stability, and cuts curtailment, emissions and fossil fuel reliance in the UK.

Discover how Zenobē’s Portable Power team used commissioning experience and battery expertise to develop an alternative solution to traditional commissioning.

The Blackhillock battery in Scotland is Europe’s largest grid-scale battery, delivering world-first Stability Services to maximise renewable energy use, prevent 2.6 million tonnes of CO₂ emissions, and reduce consumer bills by £170 million.
Get the latest insights on how energy and transport sectors are moving to net zero.
Pete leads Zenobē’s growing team of Product specialists across all areas of the business. His team oversee our R&D as well as product development in both hardware and software.
He has been working in the European E-Mobility sector from over ten years, specialising in the design, build and delivery of software systems for EV Charging.