Butlers Wood, Essex

500MW Battery Energy Storage System

Plans are now being developed for Zenobē’s Butlers Wood Battery Energy Storage System (BESS) near Bulmer Tye, bringing new energy infrastructure investment to Essex.

Part of our portfolio of battery energy storage systems across the UK

Zenobē designs, finances, builds, owns and operates battery energy storage systems (BESS). We help grid operators overcome the challenges in balancing supply and demand and overcoming power stability and constraints as we transition away from fossil fuels towards net zero.

 

By 2027, Zenobē is on track to deliver 1.2GW of battery power, which will make us one of the largest owners and operators of battery storage in the UK.

 

500MW

battery to reduce wasted

wind energy

2026

planning application
to be submitted

2029

earliest commencement
of construction

Project description

The site covers approximately 35 acres (just over 14 hectares) of agricultural land located to the south of Bulmer Tye, within the Braintree District Council area in Essex. The land lies at Ordnance Survey grid reference TL 846 378.

Site location

Butlers Wood location within the surrounding area
Drag to pan. Use + and − to zoom.

Site layout

Butler's Wood BESS sitemap
Drag to pan. Use + and − to zoom.

The site red line boundary spans across three fields. The development and infrastructure will be situated within the main field which extends to approximately 23 acres. The field to the south, which is adjacent to Butler’s Wood, is being considered for biodiversity and environmental enhancement measures while part of the field to the west, which extends to Hedingham Road, is included within the current boundary as a potential back up access route should this be required.

 

The development comprises the construction and operation of a battery storage scheme, with a total capacity of up to 500MW. The principal components of the development include:

  • c.500 battery energy storage units, housing the battery blocks, inverters, heating, ventilation and transformers
  • High voltage supergrid transformers, associated switch gear, harmonic filters and enclosure walls
  • Medium voltage switch rooms, spares containers and a control room each approximately the size of a shipping container
  • Columns for the infrared security lights and CCTV system
  • Low voltage switch rooms and auxiliary transformers

  • Internal access tracks approximately 5m in width

  • Underground cables to connect to the new Butlers Wood substation (currently under construction)

  • A perimeter metal palisade fence

  • Landscape planting and biodiversity enhancement measures

Project programme

The programme below outlines the key stages of the project, from planning and construction through to the site becoming fully operational.

Planning

Zenobē are preparing a full planning application, which will be submitted to Braintree District Council in mid-2026. The Council will consult with both statutory and non-statutory stakeholders before making a decision, which is expected later in the year.

Preparing for Final Investment Decision (FID)

If approved, the project goes through detailed design, procurement of equipment, contract negotiations with suppliers and contractors, discharging pre-commencement planning conditions and undertaking technical financial and legal due diligence to allow our funders to formally sanction the go-ahead of the project. This usually takes about one year to complete.

Construction

Aerial view of Kilmarnock South BESS site with battery foundations, construction equipment, and surrounding green fields.

Zenobē’s BESS site in Kilmarnock South, Scotland

Construction work begins with the clearance of site and the earthworks to create a level platform on which the development can be built. Once the earthworks are completed, the foundations and cable ducts will be installed and when complete, the batteries and other electrical equipment will be delivered to site, installed and connected. The construction phase for a site of this scale is about 18 months.

Commissioning

The battery and all supporting electrical equipment are thoroughly tested for several months before being connected to the National Grid.

Operation

Once connected to the electricity network, the battery site will begin delivering essential services to support more efficient and reliable grid operation. Operational maintenance requirements are minimal, meaning there will be very few vehicle movements to and from the site after construction is complete.

Decommissioning

After 40 years, all equipment and structures will be removed from site. Most equipment and materials can be reused or recycled and the land will be reinstated back to agricultural use.

Community benefit

A Community Benefit Fund will be established, with its governance and distribution framework developed in collaboration with the local community to ensure alignment with local priorities.

Share your views and meet the team

Zenobē is hosting a series of consultation events about the proposed Butlers Wood BESS, and you are invited to take part.

These events are designed to give the local community an opportunity to share views, ask questions, and learn more about the project and what it could mean for the area. Your feedback will help shape the development and how we engage, ensuring the project and associated Community Benefit Fund reflect local priorities.

We’re hosting two opportunities to meet the project team, ask questions, and share your thoughts in person. No need to book for either session.

  • Drop-in session
    Wednesday 4 March 2026
    2–4pm and 5–7pm
    Informal drop-in format – come along at any time that suits you.
  • Community meeting
    Wednesday 25 March 2026
    6pm start
    Includes a short presentation followed by Q&A and discussion.

Location for both sessions:

Bulmer Village Hall

Church Rd, Bulmer, Sudbury CO10 7EH

Complete our short online survey by clicking the button below. It only takes a few minutes, and your input will help guide how we move forward.

 

 

Who are Zenobē?

Zenobē designs, builds and operates battery energy storage systems (BESS) that maximise the uptake of renewable power, ensuring it does not go to waste and can power our homes and our transport.

Founded in the UK in 2017, we will deliver 1.2GW worth of battery storage projects by 2027.

 

Photo of a Zenobe battery on site

Commitment to net-zero

The UK Government has made a legal commitment to cut carbon emissions to net-zero. With the move away from fossil fuels, the demand for electricity will increase with the need to electrify transport, heating and more.

 

Battery storage plays a key role in helping the UK meet its net zero ambitions as it allows a greater amount of cheap renewable energy to be deployed whilst providing critical balancing and stability services without the need for traditional fossil power stations.

What is a grid-scale battery and what does it do?

Renewable energy is intermittent which means at any time there is a risk of it generating too much or too little in relation to demand from homes, businesses and transport.

 

Batteries provide ‘flexibility’ and the ability to balance the fluctuating supply and demand on the electricity system which comes with increased deployment of renewable and decentralised energy generation. For example, if wind turbines are generating more power than demand allows, batteries store this surplus energy. When wind generation is low but demand is high, battery operators release the stored electricity back into the system, ensuring this energy is not wasted.

 

Batteries also provide a wide range of additional services needed to maintain grid stability and keep the lights on. Our batteries have been the first in the world to provide fast reserve, to be used for reactive power and to manage grid constraints on the transmission network.

 

Our bespoke solutions range from ancillary, balancing and wholesale trading, to providing inertia, short circuit level, and voltage management.
Zenobē also provides non-wire alternative solutions that reduce or eliminate expensive network reinforcement costs. These are specific solutions that are essential to a decarbonised electricity system.

Rows of battery storage units at Zenobē’s Capenhurst 100 MW site, with a transmission pylon in the background.

Why Butlers Wood?

The Butlers Wood substation – currently under construction – sits on the 400kV electricity transmission network between Bramford and Pelham. This is the only 400kv circuit transmitting electricity west from Bramford, and it faces significant constraints that limit the ability to connect new energy projects in the region.


Major network reinforcements are needed, such as the ongoing Bramford – Twinstead reinforcement project, to unlock clean energy potential from East Anglia. Our proposed battery site will connect directly to the new Butlers Wood substation, providing flexible services that help grid operators balance supply and demand, improve power stability, and reduce network constraints as the UK transitions away from fossil fuels.


Without storage schemes like this one, renewable generation will face increasing curtailment over the second half of this decade and beyond, and gas‑fired stations may be called upon more frequently to maintain grid stability. The Butlers Wood BESS will play an essential role in enabling a cleaner, more resilient energy future.

Zenobē engineer conducting an on-site inspection at Capenhurst’s battery storage facility.

Do you have any questions?

If you have any questions about our battery energy storage system in development contact our project management team.

Project documents

If you cannot find the document you are looking for, get in touch with our project development team by emailing ukprojects@zenobe.com

Peter Smith

Head of Product

Pete leads Zenobē’s growing team of Product specialists across all areas of the business. His team oversee our R&D as well as product development in both hardware and software.

 

He has been working in the European E-Mobility sector from over ten years, specialising in the design, build and delivery of software systems for EV Charging.